abz.agency
abz.agency
Oct 23, 2023
We're gearing up for the winter season. This month, we've reinvested in our office infrastructure and equipment to ensure uninterrupted operations. To start, we've acquired a new diesel generator, the Kraft&Dele KD199 (18/19 kW), which will provide continuous power to office K1. While it won't completely cover the office's power requirements (which exceed 32 kW), it will enable us to run all essential equipment, lighting, the kitchen, ventilation, and an electric boiler for office heating. We also have plans for further upgrades to the electrical wiring and electrical panel. In addition, we're in the process of installing a gasoline generator, the Senci SC17000R (9/10 kW), in office K5_3. We're ensuring a reliable backup power system for this office, allowing us to power essential equipment such as lighting, the kitchen, and an electric boiler for heating. Similar to office K1, we will also be enhancing the electrical infrastructure with upgrades to wiring and the electrical panel. Lastly, for office K2, where generator installation isn't feasible, we're setting up an EcoFlow Delta PRO (3.6/4 kW) to maintain uninterrupted power supply, mainly for lighting and workstation outlets. Please note that office K4 was fully equipped for uninterrupted operation last winter with a generator that meets all the office's needs, including the electric boiler. Office K3 enjoys a permanent power supply through a backup city line. We're ready to face this winter head-on, ensur